Sluis Energy / CasesCases

Van groeiplan
naar energievraag.

From growth plans
to energy questions.

Herkenbare klantvragen. Cases die laten zien wat we onderzoeken en welke routes mogelijk zijn.

Familiar business questions. Cases that show what we assess and which routes may be possible.

Partnerprojecten

Partner projects

Smart Grid OSKneT
Smart Grid

Smart Grid OSKneT

Smart Grid OSKneT

Oosterscheldekering. 88 MW wind + 20 MW opslag, 110 MVA.

Oosterschelde barrier. 88 MW wind + 20 MW storage, 110 MVA.

RTH Airport
Strategie

RTH Airport

RTH Airport

Rotterdam The Hague Airport. Energiestrategie bij netcongestie.

Rotterdam The Hague Airport. Energy strategy under grid congestion.

GDS Avermieden
GDS

GDS Avermieden

GDS Avermieden

650 MW op HS-station Meeden. Eerste BESS-fase ~20 MW / 80 MWh.

650 MW at Meeden HV station. First BESS phase ~20 MW / 80 MWh.

Zero Emission Services
E-shipping

Zero Emission Services

Zero Emission Services

Elektrisch binnenvaart. Laden mobiele batterijcontainers op 4 locaties.

Electric inland shipping. Charging mobile battery containers at 4 locations.

Boekelermeer Haven
Smart Grid

Boekelermeer Haven

Boekelermeer Haven

Bedrijventerrein Alkmaar. Groepscontract met Liander, collectieve batterij.

Business park Alkmaar. Group contract with Liander, shared battery.

NXT Powerpark
Laden

NXT Powerpark

NXT Powerpark

Vrachtwagenlaadplein. 18 laders, 900 kW binnen netlimiet.

Truck charging hub. 18 chargers, 900 kW within grid limits.

AmstelbatterEi
BESS

AmstelbatterEi

AmstelbatterEi

Coöperatieve batterij 2 MW / 4 MWh. Eén aansluiting met windturbine.

Cooperative battery 2 MW / 4 MWh. Shared connection with wind turbine.

Co-located sites
Peak shaving

Co-located sites

Co-located sites

~70 MWh batterijen, meerdere MWp zon. Peak shaving op één aansluiting.

~70 MWh batteries, several MWp solar. Peak shaving on one connection.

Sustenso
Flex

Sustenso

Sustenso

Biogasinstallatie. 5 MWh batterij met flexibel transportcontract.

Biogas plant. 5 MWh battery with flexible transport contract.

Green Planet Pesse
Energiehub

Green Planet Pesse

Green Planet Pesse

Zonnepark + tankstation (waterstof, laden, batterij). Pilot met Enexis.

Solar park + filling station (hydrogen, charging, battery). Pilot with Enexis.

Axia College Amersfoort
Flex

Axia College Amersfoort

Axia College Amersfoort

Schoolgebouw op 55 kW. Flexibele capaciteit, live sinds 2025.

School building on 55 kW. Flexible capacity, live since 2025.

Welke route past bij jouw groei?

Which route fits your growth?